WHAT WE DO :
✓ Site visit
✓ Calibration of tools and equipment
✓ Pre-drilling
✓ Ramming Posts
✓ Simulations adapted to the requirements of the investor’s specification (freeze-thaw cycles, heavy rainfall, etc.)
✓ Testing and data collection
✓ Compensation measures / Receding
✓ Recycling of used materials
✓ Data processing and analysis
South Romania
Year : 2024
Scope of Work : Ramming, Pull-Out Test, Compression, Inclination Test, Frozen Test, Floods Test, Continuous Flight Auger Foundations
Specifics : The tests were performed on approximately 130 posts at various depths by ramming or drilling 400 mm diameter holes and filling them with concrete. In order to avoid using any type of anchoring machines during the tests, Parapet engineers designed an independent structure - "Reaction Beam" - that supposed 3D modeling in static calculation software, then modeling and detailing to obtain the drawings for the assembly. The structure was designed to carry up to 100 kN, without suffering important deformations. The engineers also simulated the freezing state of the ground around the pillar; tests were also conducted under conditions of saturation of the earth.
Denmark – Vedbaek, Thorupholmevej, Lemvig
Year : 2022
Scope of Work : Ramming, Pull-Out Test, Inclination Test and Compression Test
France – Giroussens,
Lavilledieu
Year : 2022
Scope of Work : Ramming, Pull-Out Test, Inclination Test and Compression Test
Italy – Mazara, Paterno
Year : 2023
Scope of Work : Ramming, Pull-Out Test, Inclination Test and Compression Test